The Anacostia River Tunnel Project is the second in a series of four tunnels that will mitigate combined sewer overflows that are currently discharged to the Anacostia River. The 23 foot diameter tunnel is approximately 12,500 feet in length and extends from Robert F. Kennedy (RFK) Stadium in northeast DC to Poplar Point in southeast DC. In addition to the tunnel construction, DC Water has also been building surface facilities to divert the combined sewer overflows to the tunnel at various sites along the I-295 corridor, M Street SE and the Southeast Freeway. These facilities include deep shafts that range from 20 to 60 feet wide and large concrete structures to divert raw sewage from being discharged to the Anacostia River. The construction of these facilities is unparalleled in the District. Not since the construction of the original sewer system in the early 1900’s and the Metro has the District seen construction of this magnitude.

The Anacostia River Tunnel will connect with the Blue Plains Tunnel at Poplar Point and deliver captured combined sewer overflows to the Blue Plains Advanced Wastewater Treatment plant for treatment prior to discharge to the Potomac River. With the Blue Plains and Anacostia River Tunnels in service, DC Water will have met a key Consent Decree milestone in the Clean Rivers Project. In March 2018, it is anticipated that upon completion of this first phase of the Clean Rivers Project, combined sewer overflows to the Anacostia River will be reduced by 81 percent.